PASABAHCE MERSIN GLASS FACTORY
BATCHING PLANT (1996-1997):
In this project, the complete raw material preparation plant projects are prepared and installed for Paþabahçe Mersin Glass Factory by Elimko.
First one glass furnace was started then one year later, a second glass furnace was employed. The Batching plant serves to two glass furnaces from one line. Total capacity is 600tons/day.
WEIGHT TEST SCALES (1997-1998):
Two weight test scales system is installed for Paşabahce Mersin Glass Factory to separate less filled packages.
ADDITIVES BATCHING UNITS (1998):
Two batching units for small amount additives have been installed at Paşabahce Mersin Glass Factory.