PASABAHCE MERSIN GLASS FACTORY

PASABAHCE MERSIN GLASS FACTORY

Quota

BATCHING PLANT (1996-1997):

In this project, the complete raw material preparation plant projects are prepared and installed for Paþabahçe Mersin Glass Factory by Elimko.

First one glass furnace was started then one year later, a second glass furnace was employed. The Batching plant serves to two glass furnaces from one line. Total capacity is 600tons/day.

WEIGHT TEST SCALES (1997-1998):

Two weight test scales system is installed for Paşabahce Mersin Glass Factory to separate less filled packages.

  

ADDITIVES BATCHING UNITS (1998):

Two batching units for small amount additives have been installed at Paşabahce Mersin Glass Factory.