FILYOS FIRE BRICK FACTORY

FILYOS FIRE BRICK FACTORY

Quota

TUNNEL FURNACE CONTROL SYSTEM (1980):

Temperature, pressure and gas analysis point measurement, and a recording and observing system of two tunnels furnaces are provided by Elimko.

This system is Elimko’s first Big System. All measuring, indicating and recording equipment is Elimko product.

  

RAW MATERIAL PREPARATION SYSTEM (1987):

Raw Material Preparation Systems for 9 production presses were designed and installed. Control System is designedusing the Elimko PLC System.

System operates fully automatically Operators Select formulas for each press. The System then prepares the batch, mix and transfers to the presses automatically.